City of Palo Alto Homepage
TEXT VERSION 
SEARCH FOR:
Location:
250 Hamilton Avenue
Palo Alto, CA 94301
Telephone:
Phone: 650-329-2161
Fax: 650-329-2154
Hours:
Mon-Thu 7:30-5:30pm
Fri 8-5pm (Closed Alt Fri.)
Facts, Figures, Tips and Projects

We offer a variety of programs and services to our utility customers such as rebates for resource efficiency in your home or business, customized energy use reduction strategies through our online Home Energy Analysis program, online account viewing, automatic bill payment through Bank Drafting and rate assistance if you experience an unexpected financial hardship



Let Us Hear From You!
We appreciate receiving comments and suggestions from the community. Please take a moment to let us know how we can improve our service.

City of Palo Alto Utilities
Customer Service Center, 2nd floor
250 Hamilton Avenue
Palo Alto, CA 94301
Phone: 650-329-2161

Water Saving Tips
Over 50% of your summer water use occurs outdoors in your landscape. Here's how to reduce your water bill.
[more]

My Utilities Account Login
To Register or Login to your Utilities Account
( Visit My Utilities Account )
[more]

Gas Leak Surveyors Reviewing Gas Mains and Service Points.
Utilities conducts its annual review of natural gas service points and mains now through December 2008.
[more]

Utility Rate Schedules and Service Fees Effective July 1, 2008
New utility rates for electricity, natural gas, water, refuse, storm drains, and connection fees
( Visit the utility home page )
[more]

Gas Leak Survey for 2008
Utilities' conducts its annual gas leak detection survey.
[more]

Emergency Water Supply and Storage
Learn more about the Project and the upcoming November ballot measure
( emergency water supply and storage faq page )
[more]

Photovoltaic (PV) Partners Program

CPAU customers can get rebates for installing solar photovoltaic (PV) systems.
( pv forms and downloads )
[more]


PaloAltoGreen Program
The affordable way to support 100% clean wind and solar power. 
( visit the paloaltogreen home page )
[more]

Energy Saving Tips - SUMMER
Tips for reducing energy use in the Summer
[more]

About CPAU
The City of Palo Alto Utilities (CPAU) is the only municipal utility in California that operates city-owned utility services that include electric, fiber optic, natural gas, water and wastewater services.
( related documents )
[more]

Utility Safety Information
Find out how to safely respond to common household situations and potential electric, natural gas, water, and sewer emergencies.
( visit Utilities Publications )
[more]

Utilities Contacts
View contact information, address info, or order a Utilities emergency contact refrigerator magnet.
[more]

How To Keep Your Sanitary Sewer Working Properly
Ways to prevent sewer backups and avoid expensive emergency plumbing.
[more]

Geoexchange Heat Pump
Learn how the Children's Library in Palo Alto is utilizing a geoexchange heat pump to heat and cool the building more efficiently.
( see how it all works )
[more]

Palo Alto Recycled Water Project
The Palo Alto Recycled Water Project (Project) is Phase 3 of the City of Palo Alto Water Reuse Program.
[more]

Commercial Fiber Service
Current information on new fiber-ready properties, new backbone segments and splice points on our network and other system improvements.
[more]

Utilities Rules and Regulations
Here is a listing of the current rules and regulations for City of Palo Alto Utilities (CPAU) customers.
( visit Utilities Publications )
[more]

Electricity Reliability During Summer Months in California
During Summer Months Here is what CPAU customers need to know about the situation, what Palo Alto is doing and what customers can do to help avert long term outages.
[more]

Power Content Label
The Power Content Label (PCL) is very much like a nutrition label to help consumers make informed decisions when selecting an energy service provider or energy product.
( utilities forms and publications )
[more]

Informative and Useful Brochures
A listing of informative brochures in PDF format available for download
( visit Utilities Publications )
[more]

Your Home
UTILITIES EARNS HIGH CUSTOMER SATISFACTION RATINGS IN STATEWIDE SURVEY. Residential customers of California municipal utilities like Palo Alto are very satisfied with their community-owned utilities, according to a statewide survey conducted recently.
( utilities faqs )
[more]

Landscape Efficiency Standards
The Palo Alto Municipal Code incorporates a set of standards that are applied to any new or renovated landscape for commercial, industrial, multi-family common area, or City Facility projects with 1500 square feet of landscaped area. The Code requires that these plans meet the requirements of The City of Palo Alto Landscape Water Efficiency Standards before a building or grading permit is issued.
[more]

Water Quality Report
We're proud to provide this community with water that meets or exceeds all state and federal standards for water quality, according to data reviewed and approved by the California Department of Health Services (DOHS).
[more]

Furnace Replacement
A standard building permit is used for furnace replacement
( visit the development center )
[more]

Winter Gas Saving Tips
Energy Savings Tips for the Winter
[more]

Utilities Enterprise Budget Documents
The City of Palo Alto Utilities (CPAU) is the only municipal utility in California that operates city-owned utility services that include electric, fiber optic, natural gas, water and sewer services.
230 KV ELECTRIC INTERTIE (EL-06001)
This project will establish a 230 kV electric intertie line and construct a 230/60 kV substation to connect the City's electric system directly to the 230kV.
Revision Date: 06/21/2006
DIRECTIONAL BORING EQUIPMENT (GS-03007)
This project will fund the purchase of additional equipment for the Utilities WGW Operations Division to assist with installing and locating new gas services by using directional boring methods. Increased use of directional boring to install gas facilities has reduced both damage to surface improvements (sidewalks, paving, landscaping, etc.) and associated restoration costs. Continued use of directional boring construction requires additional and replacement tooling.
Revision Date: 06/21/2006
Electric Fund
The Electric Utility transitioned out of its 40-year contract with the Western Area Power Administration (WAPA) at the end of 2004. Major elements of the Council-approved long-term electric resource plan will continue to be implemented in the coming budget year. The goal of the implementation plan is to transition to a diversified energy portfolio that balances economics, reliability and sustainability, and to meet the critical objective of stable rates.
Revision Date: 06/21/2006
Enterprise Funds Capital Improvement Program
The 2005-06 Adopted Enterprise CIP expense is $29.8 million. Expenditures have increased by $2.9 million compared to the prior year, due to a number of new projects being added. A summary of new projects being added is presented in subsequent pages.
Revision Date: 06/21/2006
Gas Fund
In 2005-07, the City of Palo Alto Utilities (CPAU) plans to focus on customer service, infrastructure reliability, maintaining an excellent safety record, managing energy portfolio risk, providing stable and low supply costs, and containment of salary and non-salary costs. These high priority areas are aligned with the strategies and objectives of the CPAU strategic plan.
Revision Date: 06/21/2006
March, 2005 Residential Customer Survey Report Of Findings
This report summarizes and highlights the findings of City of Palo Alto Public Utilities’ early 2005 survey among residential customers. This is the second time Palo Alto has conducted a survey of this type, with its initial benchmark study first done in 2002, also in conjunction with the CMUA Statewide Survey of Residential Customer Satisfaction.
Revision Date: 06/21/2006
MAYFIELD PUMP STATION (WS-04004)
This project will install three centrifugal pumps at the Mayfield Pump Station to deliver a higher water capacity to Pressure Area 2. A new discharge pipeline from the pump station will be connected to an existing 30-inch Pressure Area 2 pipeline on the Mayfield Reservoir site. Standby power facilities will be provided for this facility and will be sized to power both Pressure Area 2 and the existing Mayfield pump station for Pressure Area 1. Includes upgrades to instrumentation.
Revision Date: 06/21/2006
SEWER MANHOLE REHAB/REPLACEMENT (WC-99013)
This project will rehabilitate or replace defective sewer laterals and manholes that are identified during the City's routine maintenance activities on the Wastewater Collection System. This project will also clean and videotape sewer collection mains and laterals as necessary.
Revision Date: 06/21/2006
Statewide And Palo Alto Business Customer Satisfaction Survey Results
A sample of Palo Alto business customers were surveyed by telephone by RKS Research and Consulting as part of a statewide customer satisfaction survey conducted by California Municipal Utilities Association (CMUA).
Revision Date: 06/21/2006
Wastewater Collection Fund
Consistent with the department-wide goal of focusing on reliability concerns for customers, staff will continue the construction stages of several major capital improvement projects (CIP). A final draft of a new Wastewater Collection System Master Plan has been received, and will be used to compile future CIP recommendations.
Revision Date: 06/21/2006
Water Fund
Due to the critical need to ensure sufficient water supplies during emergency situations, CPAU has accelerated the implementation of the recommendations of the 1999 Water Wells, Regional Storage, and Distribution Study. This study was commissioned to evaluate ways to improve the operation and reliability of the City's water distribution system, particularly during emergency situations.
Revision Date: 06/21/2006
Acceptable Use PolicyAccessibilityYour PrivacySite MapSearch EngineComment FormMissing Content